Does anyone have experience setting up a small still in an existing brewery?
Guess I should be more specific. Regarding the permits coexisting in the same building, moving wash from the brewery side to the distilling side, stuff lik e that. I know ultimately consult with legal counsel, but if anyone has a quick synopsis of this type of setup. Thanks!