Product Description: 1200L SUS304 boiler + electric heating jacket boiler + 4plates 10inch copper column +8plates 10in SUS304 column +10in gin basket+condenser System
The system is brand new, has never been used. About 6 months old and is stateside (located in NC).
includes:
1)1200L SUS304 electric heating Boiler (2layers)
12000L SUS304 boiler with electric heating jacket
1pc of 8” tri-clamp port (for copper helmet)
2pc of 2”tri-clamp port on the top with end cap
CIP spray ball
400mm manway with sight glass
Thermometer (analog)
Pressure gauge
Safety valve
Agitator1.5KW, 36RPM (240v/ 3phase 60)
Wall thickness 3mm
B.electric heating jacket
4pcs 16kw heating element
Wall thickness 3mm
2) Copper helmet with chimney
With a thermometer
500mm diameter copper helmet
copper chimney
3)Distiller reflux column
A.4Plate 10 inch Copper Column -1PC
10”copper bubble plates inside - 4pc
Sight glass in each plate - 5pc
Drain valve on each plate - 5pc
CIP spray ball on each plate - 5pc
B.4Plate 10 inch SUS304Column -2pcs
10” bubble plates inside - 8pc
Sight glass in each plate - 9pc
Drain valve on each plate - 9pc
CIP spray ball on each plate - 9pc
C.Dephlegmator - 2PCS
2pcs of 300 mm length 10" SUS304 dephlegmator
4pcs of 1”female BSP port for water inlet and outlet
With a thermometer
4)Condenser - 1PC
1500mm height 10” condenser
2pcs of 1”female BSP port for water inlet and outlet SUS304 Parrot
with drain valve.
5)Gin basket
10in SUS304 Gin Basket
500mm height
Ø100mm sight glass
1pc SUS304 filter mesh
CIP spray ball
6)Stainless steel pipe seat--4pcs
For copper column
For SUS304 column
For gin basket
For condenser
7)CIP System
1PC CIP Spray Ball in the boiler
1PC CIP Spray Ball in the copper helmet
20PC CIP Spray Balls in the column (1 above each plate)
1PC gin basket
1PC Pump and Plumbing
1PC CIP for condenser
8)Controller box
Cip
Heating element
Agitator
We are looking to sell around 90K- accepting offers.