Jump to content

Emily Spear

Members
  • Posts

    2
  • Joined

  • Last visited

Posts posted by Emily Spear

  1. Product Description: 1200L SUS304 boiler + electric heating jacket boiler + 4plates 10inch copper column +8plates 10in SUS304 column +10in gin basket+condenser System

    The system is brand new, has never been used. About 6 months old and is stateside (located in NC).

    includes:

    1)1200L SUS304 electric heating Boiler (2layers)

    • 12000L SUS304 boiler with electric heating jacket
    • 1pc of 8” tri-clamp port (for copper helmet)
    • 2pc of 2”tri-clamp port on the top with end cap
    • CIP spray ball
    • 400mm manway with sight glass
    • Thermometer (analog)
    • Pressure gauge
    • Safety valve
    • Agitator1.5KW, 36RPM (240v/ 3phase 60)
    • Wall thickness 3mm
    • B.electric heating jacket
    • 4pcs 16kw heating element
    • Wall thickness 3mm

    2) Copper helmet with chimney

    • With a thermometer
    • 500mm diameter copper helmet
    • copper chimney

    3)Distiller reflux column

    • A.4Plate 10 inch Copper Column -1PC
      • 10”copper bubble plates inside - 4pc
      • Sight glass in each plate - 5pc
      • Drain valve on each plate - 5pc
      • CIP spray ball on each plate - 5pc
    • B.4Plate 10 inch SUS304Column -2pcs
      • 10” bubble plates inside - 8pc
      • Sight glass in each plate - 9pc
      • Drain valve on each plate - 9pc
      • CIP spray ball on each plate - 9pc
    • C.Dephlegmator - 2PCS
      • 2pcs of 300 mm length 10" SUS304 dephlegmator
      • 4pcs of 1”female BSP port for water inlet and outlet
      • With a thermometer

    4)Condenser - 1PC

    • 1500mm height 10” condenser
    • 2pcs of 1”female BSP port for water inlet and outlet SUS304 Parrot
    • with drain valve.

    5)Gin basket

    • 10in SUS304 Gin Basket
    • 500mm height
    • Ø100mm sight glass
    • 1pc SUS304 filter mesh
    • CIP spray ball

    6)Stainless steel pipe seat--4pcs

    • For copper column
    • For SUS304 column
    • For gin basket
    • For condenser

    7)CIP System

    • 1PC CIP Spray Ball in the boiler
    • 1PC CIP Spray Ball in the copper helmet
    • 20PC CIP Spray Balls in the column (1 above each plate)
    • 1PC gin basket
    • 1PC Pump and Plumbing
    • 1PC CIP for condenser

    8)Controller box

    • Cip
    • Heating element
    • Agitator

    We are looking to sell around 90K- accepting offers.

    Screen Shot 2022-05-31 at 2.11.18 PM.png

    Screen Shot 2022-05-31 at 2.12.02 PM.png

    0FB09033-CE3E-4407-AFFF-D232CAE2F1F4_1_105_c.jpeg

    954F231E-7DA7-4CB5-AFBA-710D7D63EBC5_1_105_c.jpeg

    747CF95F-2C1E-4E1C-8787-A3D65573B17B_1_105_c.jpeg

    393E0892-6D0B-43A7-BE55-F7FB97F4030C_1_105_c.jpeg

    DC770A27-E2A6-4266-836C-3DD0F8FAF6A5_1_105_c.jpeg

    F12C46EB-6130-4EC9-AF7B-64ADFB1FCBDE_1_105_c.jpeg

×
×
  • Create New...