Search the Community
Showing results for tags 'clt'.
-
Has anyone else had difficulty getting equipment delivered on time? Or even in the realm of on time? What about quality issues? Equipment delivered that was essentially not manufactured correctly and working properly or parts missing? Customer service that disappears right after the sales part of it? I feel like there's got to be others out there who have dealt with this from supposedly reputable manufacturers. It's beginning to feel like an epidemic of everything that I purchase. I do my research and talk with references, etc. It literally doesn't seem to help.
- 13 replies
-
- manufacturers
- mash tuns
- (and 9 more)
-
I have a 25 ton air cooled chiller for sale. I purchased 2 and am only using one. (Currently wired for 460 3 phase but I converted the other over to 208 3 phase in under an hour with no extra parts....just changed the wiring on the transformer, compressor, and pump) Built in 2000. 25 HP compressor (300,000 BTU/Hr) Air cooled condensers that sit outside Compressor and control panel on casters w/ 75 gallon reservoir Currently wired for 460V 3 phase (see above) Name Plate Info: Manuf: Cooling Technology Inc Model No: CPCA 25R Serial No: 99164-01 Date of Mfg: 2-15-00 Voltage: 460-3-60 Compressor HP: 25 Pump HP: 3 Fan HP: 3/4 Full Load Amps: 50.1 Refrigerant: R-22 Charge: 34 lbs Asking $7,500. Please contact adam.stumpf@stumpysspirits.com for more info. Thanks, Adam