I am trying to get my 26 Gallon Hillbilly Still going for some test batches while I wait for my boiler gets fired up and I am having a huge issue with my controller only able to function at 18.5 AMPs. It should be able to pull at least 24-26 amps. Currently when testing with water its taking me 2 hours at full throttle to bring up my mash to full temp. I am using water to test and it took 2 hours to not even boil water.
Back story! I am in Ontario, Canada and am in an industrial building. I have 3 phase 200 amp service with 208 voltage. The controller calls for a 30 amp breaker and a dryer plug. I have a licensed electrician install it and he even double checked it was wired using 2 hot wires etc. I called around and everyone says I need to purchase a 30 amp step up transformer which is isolated to my 30 amp breaker to run my element at the correct amperage. I was also told that if i keep running my element on my current voltage i am starving the element and it will burn out fast.
When quoted a step transformer CSA approved is upwards of 1000$. This is only for a test still which we planned on testing small batches with before going to the large productions.
Any help quickly would be greatly appreciated! I have Rum fermenting and nothing to still it with =/